Customer stories

Real deployments. Measured outcomes.

Vutility's sensors are deployed in 35,000+ commercial locations across hospitality, oil & gas, telecommunications, multifamily, healthcare, and more. Here's what customers are doing with the data.

35K+
Devices deployed
12
Verticals served
100+
Customer buildings
9
International patents
Industry
03.0 / All stories

10 more deployments. More on the way.

Healthcare
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-1]
Chiller plant / central utility plant

Hilton hospital network — $168K/year on chiller-plant submetering.

1,000+ HotDrops on the chiller plant and AHU feeders. 12% energy reduction in year one. Caught a misconfigured pump in the first week of deployment.

$168K / yr 12% reduction VERIFY
Read story →
Oil & Gas
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-2]
Refining-unit motor / VFD

Chevron refinery — 2% motor output improvement on a refining unit.

312 HotDrops on critical motors and feeders. Non-invasive install during a maintenance window — zero process disruption. Anonymizable as "a Fortune 50 oil & gas major" if PR sign-off lags.

312 devices 2% output lift VERIFY
Read story →
Commercial Real Estate
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-3]
Office tower interior / electrical room

JLL at VIA Outlets — 568 datapoints, no tenant downtime.

Wireless install across a multi-tenant outlet portfolio. Sub-tenant cost allocation rolled out without taking a single retail space offline. Year-one portfolio energy reduction of 12%.

568 datapoints 12% reduction
Read story →
Commercial Real Estate
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-4]
Install-in-progress shot

Losaw — 500 HotDrops installed in 1.5 days.

Single-mobilization install across the Losaw CRE portfolio. Two-person crew. Sub-circuit visibility across the entire managed portfolio inside of 48 hours of project kickoff.

500 sensors 1.5 days end-to-end
Read story →
Telecom
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-5]
Tower-base cabinet / AC feed

Major tower operator — truck-rolls down, remote-site visibility up.

HotDrop on AC feeds across thousands of cell sites. Battery-backup health, beacon-light failures, and HVAC anomalies caught remotely. Anonymizable until carrier PR approval. PLACEHOLDER

VERIFY Truck-roll reduction
Read story →
Multi-Site Services
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-6]
Service depot / laundry plant

Cintas — portfolio submetering across services-chain locations.

Site-level energy comparison across a multi-state services portfolio. Outliers flagged automatically; a laundry plant running 30% hotter than its sibling sites was service-dispatched before it killed inventory. PENDING SIGN-OFF

VERIFY Sites monitored
Read story →
Energy & Sustainability
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-7]
Investor / strategic-partner shot

Constellation — energy-services partner deployment.

VoltDrop on customer service-entrance meters as part of a managed energy-services engagement. M&V on retrofit projects in two markets. DRAFT — confirm scope with Stephen

VERIFY Customer sites
Read story →
Commercial Real Estate
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-8]
Tenant submetering rollout

MeterZ — tenant-billing partner across CRE portfolios.

Vutility hardware feeding MeterZ's tenant-billing platform. Same-day device commissioning at multiple buildings; integration with existing tenant-billing workflows.

Multi-bldg Same-day commissioning
Read story →
Multifamily
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-9]
Apartment building / utility closet

Multifamily portfolio — RUBS-to-submetering transition.

VoltDrop and PulseDrop replacing RUBS-based chargeback across a build-to-rent portfolio. Wireless install in occupied units. Compliance with state submetering mandates. PLACEHOLDER customer name

VERIFY Units submetered
Read story →
RV / Outdoor
❏ Case study photo
[CASE-STUDY-PLACEHOLDER-10]
KOA campsite / pedestal

KOA approved-vendor program — pedestal submetering at scale.

Vutility as a KOA approved vendor for site-level electric chargeback across the KOA franchise network. Pedestal-level usage data with rolled-up portfolio reporting for KOA corporate.

Approved vendor Franchise network
Read story →

Stories by industry

Find a deployment that looks like yours. PLACEHOLDER counts — adjust as Stephen's 20 land

Commercial Real Estate 5
Hospitality & RV 4
Oil & Gas / Industrial 3
Telecommunications 2
Multi-Site / Retail 2
Healthcare 2
Multifamily 1
Energy & Sustainability 1
Institutional
Utilities & Infrastructure
Marinas
Energy & Sustainability (h)
04.0 / What we measure across studies

Patterns that hold across deployments.

Aggregate ranges across Vutility deployments. Specific figures vary by site density, energy intensity, and utility rates — always pressure-tested with a Vutility engineer before being quoted.

Per-site revenue impact
$1.0K–$1.4K/site/mo
Industry benchmark for multi-site brand operators discovering monitoring savings — energy reduction plus avoided dispute volume plus operational anomaly catches. Per Vutility's customer mix at portfolio scale. VERIFY range with Stephen
Per-sensor install time
<5 min typical
HotDrop snaps over a conductor in seconds. With panel access, commissioning, and CloudVU pairing, a single sensor is online inside of 5 minutes. Sub-1-hour for typical deployments of 10–20 sensors.
Time to first insight
Same-day
Data streams to CloudVU within minutes of clip-on. First anomalies, comparisons, and demand-charge insights show up the same day install crew leaves the site. No lag for a portal to ingest. No service-contract delay.

Send us your numbers.

Share your site count, energy spend, and utility-rate region. We'll model the device count, install plan, and likely payback against actual Vutility deployments at similar scale.